Splash Pad Construction & Installation

Construction can sometimes be the hard part. Luckily you are in good hands, with over 40 years experience in general contracting and landscape design here at SplashpadsUSA.


FIRST STAGE

Splash Pad Construction Installation

We start with excavation of the design you have chosen for your splash pad. Excavating approximately 12 inches of ground allows us to accommodate the internal plumbing of the unit. After forming the design and shape of your splash pad, we then connect the internal plumbing. This is protected by a sand base to help protect the plumbing from puncture or other damage. At this point, the piping connections to your nozzles and above-ground waterplay feature plates are placed. We then cover up the piping with another 6 inches of sand to ensure that the pipes are protected

SECOND STAGE

Splash Pad Construction Installation Tanks
 
At this stage, we are ready for the placement of an oversized tank into the ground near your splash pad.  At SplashpadsUSA we only use oversized tanks so that water supply to your feature is never an issue.  These tanks are also likely to be the best installation for anyone wanting to have the option for add-on above ground features in the future

THIRD STAGE

Splash Pad Construction Installation Design Valves
 
Gravel is added to the splash pad so that correct compaction is obtained for the next step which is concrete. Once compaction is performed to a tight compaction, the splash pad is ready for the rebar. Rebar is installed 12 inch on center and adequately fastened and secured so that the steel is properly centered for the concrete pour.  This step ensures that your concrete will not crack or sink

FOURTH STAGE

Splash Pad Construction Installation Cement Pad
Now it’s time to pour concrete. We only use the best concrete mix, giving you a nice finish which will endure for many years of wear and tear without spalling or chipping. We also provide top-of-the-line surface coat options for extra protection. After we pour the concrete, we put in adequate control joints to allow for normal expansion, preventing cracks. After the concrete cures for roughly 30 days, SplashpadsUSA then installs all of the equipment, including the filters, pumps, chlorinators, sanitizers, etc…

FIFTH STAGE

Splash Pad Construction Installation Cement
 
 
The final step before you are fully operational involves hooking up all of your equipment which must be safely stored near the splash pad. The enclosure for your equipment should safely house your equipment with easy access for maintenance

FINAL STAGE

Splash Pad Construction Installation Filter Tank House
 
 
 
Now you are ready for the installation of the FUN parts! The above ground water play features are installed

TURN ON YOUR SPLASH PAD & ENJOY!

Splash Pad Construction Installation Design Finished
 
One of our trained professionals will go over the maintenance and care of your new interactive splash pad or water play feature with your designated representative. Options for maintenance packages are available for certain locations and can be discussed with your sales representative